document.write( "Question 170272: 5. A concrete driveway measures 14 yards by 5 yards. The driveway will be 0.75 yards thick. (a) How many cubic yards of concrete will be needed? (b) How much will it cost if concrete is $4.75 per cubic yard? \n" ); document.write( "
Algebra.Com's Answer #125704 by Earlsdon(6294)\"\" \"About 
You can put this solution on YOUR website!
Ok, you'll need to find the volume of the concrete required for this job.
\n" ); document.write( "Recall:
\n" ); document.write( "\"V+=+L%2AW%2AD\" where L = length, W = width, and D = depth, so...
\n" ); document.write( "\"V+=+%2814%29%285%29%280.75%29\"
\n" ); document.write( "\"V+=+52.5\"Cu.yds
\n" ); document.write( "If each cubic yard of concrete costs $4.75, the 52.5 cubic yards will cost 52.5 times $4.75
\n" ); document.write( "\"C+=+%2852.5%29%284.75%29\"
\n" ); document.write( "\"C+=+249.375\" Since we are dealing with dollars, we round up the nearest hundreth to get:
\n" ); document.write( "C = $249.38