SOLUTION: A rectangular trench is to be dug which is to be 300 ft long, 36 ft wide and 10 ft deep. A large dump truck can carry 20 cubic yards in a load. How many truck loads will be require
Algebra.Com
Question 138478: A rectangular trench is to be dug which is to be 300 ft long, 36 ft wide and 10 ft deep. A large dump truck can carry 20 cubic yards in a load. How many truck loads will be required to remove the dirt from this trench?
Answer by stanbon(75887) (Show Source): You can put this solution on YOUR website!
A rectangular trench is to be dug which is to be 300 ft long, 36 ft wide and 10 ft deep. A large dump truck can carry 20 cubic yards in a load. How many truck loads will be required to remove the dirt from this trench?
---------------------------------------
volume = (300*36*10) = 108000 cu. ft
each cubic yard = 3*3*3 = 27 cu ft
20 cu. yards = 20*27 cu ft. = 540 cu ft.
----------
# of truck loads = 108000/540 = 200
=============
Cheers,
Stan H.
RELATED QUESTIONS
Dirt is to be removed from a foundation that is 120 ft long, 60 ft wide, and 12 ft deep... (answered by josgarithmetic)
A concrete worker is pouring the footer for a rectangular house that is 60 ft long and 40 (answered by checkley77)
Kristen has to dig a pool in the yard. The pool will be a rectangular prism and be 14... (answered by Alan3354)
A trench is 200 ft. long and 12 ft. deep, 8 ft. wide at the top and 4 ft. wide at the... (answered by ewatrrr)
A rectangular swimming pool is 50 ft. wide, 100 ft. long, and 10 ft. deep. The pool will... (answered by checkley77)
A rectangular swimming pool is 50 ft. wide, 100 ft. long, and 10 ft. deep. The pool will... (answered by josgarithmetic)
a box is 11 ft. wide, 20 ft. long, and 7 ft deep. what is the... (answered by solver91311)
a building is 2o ft long, 20 ft wide, and 20 ft high. Using a scale of 2 ft per inch,... (answered by checkley77)
a trench is 160ft long and 10ft deep, 8ft wide at the top and 5ft at the bottom. how many (answered by ankor@dixie-net.com)