SOLUTION: Smith Engineering is in the process of reviewing the salaries of their surveyors. During this review,the company found that an experienced surveyor can survey a road bed in three h

Algebra.Com
Question 716023: Smith Engineering is in the process of reviewing the salaries of their surveyors. During this review,the company found that an experienced surveyor can survey a road bed in three hours. An apprentice surveyor needs seven hours to survey the same stretch of road. if the two work together, find out how long it will take them to complete the job.
Answer by josmiceli(19441)   (Show Source): You can put this solution on YOUR website!
Add their rates of working:
An experienced surveyor's rate = ( 1 road bed ) / ( 3 hrs )
An apprentice surveyor's rate = ( 1 road bed ) / ( 7 hrs )
Let = their time in hrs with both working

Multiply both sides by



Working together, it will take them
2.1 hrs to complete the job.

RELATED QUESTIONS

smith engineering is in the process of reviewing the salaries of their surveyors. during... (answered by DrBeeee)
Smith engineering is in the process of reviewing the salaries of their surveyors. During (answered by josmiceli)
Smith engineering is in the process of reviewing the salaris of their surveyors. During... (answered by stanbon)
The national average salary for a computer consultant is $53,336. For a large computer... (answered by robertb)
The salaries of a secretary, a salesperson, and a vice president for a retail sales... (answered by josgarithmetic)
Company A charges a fee of 3$ plus $0.60 per page. Company B charges $0.75 per page. How (answered by josgarithmetic,josmiceli,MathTherapy)
A mobile phone manufacturer is promoting a new mobile because of its excellent battery... (answered by Boreal)
The sum of the ages of Mr. Smith, Ms. Smith and their son, Tommy Smith, is 74. Ten years... (answered by ankor@dixie-net.com)
A car company found that ,on average, 2 in 100 of their car engines malfunction during... (answered by Boreal)