SOLUTION: Hector can shovel snow off the sidewalk in three hours. Oliver can shovel off the same sidewalk in 2 hours. How long will it take them to shovel the snow off the sidewalk if they w
Algebra.Com
Question 372658: Hector can shovel snow off the sidewalk in three hours. Oliver can shovel off the same sidewalk in 2 hours. How long will it take them to shovel the snow off the sidewalk if they work together?
Answer by checkley79(3341) (Show Source): You can put this solution on YOUR website!
1/3+1/2=1/X FIND THE LCD.(2*3=6)
(1*2+1*3)/2*3=1/X
(2+3)/6=1/X
5/6=1/X CROSS MULTIPLY.
5X=1*6
X=6/5
X=1.2 HOURS WORKING TOGETHER.
RELATED QUESTIONS
Hector can shovel show off the sidewalks in three hours (He doesn’t live in Southern... (answered by nerdybill)
It takes Eddie 2 hours to shovel the snow from a driveway and sidewalk. Brad can shovel... (answered by Boreal,josgarithmetic,solver91311,ikleyn)
One person can shovel the snow from a sidewalk in 2 hours and another person canshovel... (answered by stanbon)
brandon can shovel his sidewalk in 8 minutes nad his brother can shovel the sidewalk in... (answered by stanbon,MathTherapy)
Suppose the one worker can shovel snow from a sidewalk in 50 minutes and another worker... (answered by oberobic)
suppose that one worker can shovel snow from a storefront sidewalk in 50 minutes and... (answered by Alan3354)
Chuck can shovel the snow off his driveway in 40 minutes. He shovels for 20 minutes and... (answered by askmemath)
Janet can shovel snow from her driveway in 65 minutes. Bill can do the same job in 50... (answered by ankor@dixie-net.com)
Maria can shovel snow from her driveway in 60 minutes, jim can do the same job in 55... (answered by solver91311)