SOLUTION: It takes 5 days for a steamboat to travel from A to B along a
river. It takes 7 days to return from B to A. How many days will
it take for a raft to drift from A to B (all spe
Algebra.Com
Question 1039010: It takes 5 days for a steamboat to travel from A to B along a
river. It takes 7 days to return from B to A. How many days will
it take for a raft to drift from A to B (all speeds stay constant)?
(1) 13
(2) 35
(3) 6
(4) 12
Found 2 solutions by solver91311, ikleyn:
Answer by solver91311(24713) (Show Source): You can put this solution on YOUR website!
Let the rate of the steamboat be represented by
and the rate of the current be represented by
. Since the trip from A to B takes less time than from B to A, the boat must be going with the current. That means that the total speed of the boat with respect to the bank of the river is
. Likewise, going back upstream, the speed is
.
Let
represent the distance from A to B. One assumes that A and B are fixed points so that the distance remains constant regardless of the direction of travel. We know that distance equals rate times time, so the downstream trip is modeled by:
and the upstream trip by:
Since
, we can write:
Solving:
And substituting into the model for the downstream trip:
Dividing both sides by
we get:
And since time is equal to distance divided by rate, we have our answer.
John

My calculator said it, I believe it, that settles it

Answer by ikleyn(53763) (Show Source): You can put this solution on YOUR website!
It takes 5 days for a steamboat to travel from A to B along a
river. It takes 7 days to return from B to A.
How many days will
it take for a raft to drift from A to B (all speeds stay constant)?
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Also see the lesson Unpowered raft floating downstream along a river in this site, where similar problem was solved.
RELATED QUESTIONS
It takes 3 days for a space vehicle to travel from earth to the moon. How long many days (answered by rfer)
A takes 5 days to finish a work, B takes 8 days to finish the same work. If A,B,C... (answered by josgarithmetic,ikleyn)
A takes 20 days to complete a job X. B takes 30 days to complete the same job X. How... (answered by CubeyThePenguin)
It takes 24 days for 8 workers to complete painting a building, how many days will it... (answered by josgarithmetic)
If it takes 8 men to complete a job
in 8 days, how many days would it take 1... (answered by stanbon)
If it takes 6 men to do a job in 4 days how many days will it take 2... (answered by oscargut)
If it takes twelve men 8 days to dig a trench how many men does it take in 6... (answered by josgarithmetic)
if it takes 3 days for a space vehicle to travel from earth to the moon. how long will... (answered by ankor@dixie-net.com,Alan3354)
It takes worker A six days longer as it takes worker B to finish a certain job. Working... (answered by greenestamps,ikleyn)