SOLUTION: Three masons build of wall. Mason A builds 7.0m/day , B builds 6.0m/day , and C builds5.0 m/day . Mason B works twice as many days as A , and C works half as many days a

Algebra.Com
Question 1055486: Three masons build of wall. Mason A builds 7.0m/day , B builds 6.0m/day , and C builds5.0 m/day . Mason B works twice as many days as A , and C works half as many days as A and B combined. How many days did each work?
Found 2 solutions by ikleyn, MathTherapy:
Answer by ikleyn(52914)   (Show Source): You can put this solution on YOUR website!
.
Three masons build of wall. Mason A builds 7.0m/day , B builds 6.0m/day , and C builds 5.0 m/day.
Mason B works twice as many days as A , and C works half as many days as A and B combined. How many days did each work?
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

First part of the condition (first line) is not relevant to the question and, therefore, doesn't bring the useful info at all.

The second part and the formulation in whole has no sufficient info to answer the question.


Answer by MathTherapy(10557)   (Show Source): You can put this solution on YOUR website!
Three masons build of wall. Mason A builds 7.0m/day , B builds 6.0m/day , and C builds5.0 m/day . Mason B works twice as many days as A , and C works half as many days as A and B combined. How many days did each work?
The masons built 318 m of wall. This was OMITTED.

Let number of days A worked be D
Then number of days B worked = 2D
Number of days C worked =
Amounts built by A, B, and C are: 7D, 6(2D), or 12D, and , respectively
Since a 318-meter wall was built, we get:

38D + 15D = 636 ------- Multiplying by LCD, 2
53D = 636
D, or number of days A worked = , or
Number of days B worked: 2(12), or
Number of days C worked: , or
RELATED QUESTIONS

The first day, a contractor hired 11 carpenters, 3 masons, and 5 helpers. The second... (answered by ankor@dixie-net.com)
The volume of first cylinder is 12m^3. Second cylinder height is 3 time longer and base... (answered by mananth,greenestamps,josgarithmetic,ikleyn,Alan3354)
A man builds a chair in 4 days, working 6 hours a day. How many hours should he work in a (answered by robertb)
a mason builds two patios with the same area. One is a square and the other is a... (answered by rapaljer)
On the first day, Nabil put $1 in a big box. Then, each succeeding day, he added to the... (answered by Alan3354)
if 15 men build a wall 35 m high in 14 day in how many day will 30 men build a smilar... (answered by josgarithmetic)
If 6 masons and 8 helpers can do a construct a boundary wall in 10 days while 26 masons (answered by ikleyn)
A building contractor employs a master mason, a journeyman mason and an apprentice mason. (answered by ankor@dixie-net.com)
A mason and his assistant work on a fireplace for 6 hours together. Then the mason... (answered by Boreal)