Here's how to work it using "man days", which is "men times days".
So a job requires 12∙8 or 96 man days.
That was 12∙3 or 36 of the required number of 96 man days. So 96-36 or 60 more man days were needed.
So that made 15 men to complete the remaining 60 man days. So 60 man days divided by 15 men gives 4 days. Edwin