SOLUTION: A contractor estimated that 30 ft3 of cement is required to make a concrete floor that measures 90 ft2. Using this estimate, find how many additional cubic feet of cement would be
Algebra.Com
Question 801760: A contractor estimated that 30 ft3 of cement is required to make a concrete floor that measures 90 ft2. Using this estimate, find how many additional cubic feet of cement would be required to make a concrete floor that measures 450 ft2.
Answer by Cromlix(4381) (Show Source): You can put this solution on YOUR website!
30 ft3 of cement is required to make a concrete floor that measures 90 ft2.
30 ft^3 required for 90 ft^2
450/90 = 5
30 * 5 required for 5 * 90
150 ft^3 required for 450 ft^2
Hope this helps.
:-)
RELATED QUESTIONS
A contractor estimated that 30 ft^3 of cement is required to make a concrete floor that... (answered by rfer)
A contractor estimated that 30 ft^3 of cement is required to make a concrete floor that... (answered by checkley77)
A contractor estimated that 30 ft^3 of cement is required to make a concrete floor that... (answered by josmiceli)
A contractor mixed two batches of concrete that were 9.3 and 11.3 percent cement to... (answered by Earlsdon)
You need to order cement to make a concrete sidewalk 3 feet wide and 80 feet long.... (answered by ankor@dixie-net.com)
a certain concrete mixture contains 6.00% cement and 8.00% sand how many kilograms of... (answered by josgarithmetic,ankor@dixie-net.com,ikleyn)
Concrete is made of cement, water, and aggregate (sand and gravel). Aggregate should make (answered by jorel555)
Concrete is made of cement, and aggregate (sand and gravel). Aggregate should make up 75% (answered by jorel555)
The density and strength of concrete are determined by the ratio of cement and aggregate
(answered by josgarithmetic)