SOLUTION: A contractor estimated that 30 ft^3 of cement is required to make a concrete floor that measure 90 ft^2. Using this estimate, how much cement is required to make a concrete floor t

Algebra.Com
Question 315318: A contractor estimated that 30 ft^3 of cement is required to make a concrete floor that measure 90 ft^2. Using this estimate, how much cement is required to make a concrete floor that measures 120ft^2?
Answer by rfer(16322)   (Show Source): You can put this solution on YOUR website!
30/90=x/120
90x=3600
x=40 cu ft

RELATED QUESTIONS

A contractor estimated that 30 ft^3 of cement is required to make a concrete floor that... (answered by checkley77)
A contractor estimated that 30 ft^3 of cement is required to make a concrete floor that... (answered by josmiceli)
A contractor estimated that 30 ft3 of cement is required to make a concrete floor that... (answered by Cromlix)
The density and strength of concrete are determined by the ratio of cement and aggregate (answered by josgarithmetic)
A certain mixture for concrete is in the amounts of 1:2:4; 1 cu. ft. of cement. 2... (answered by ikleyn)
A concrete mix is in volume proportions of 1 part cement, 2 parts water, 2 parts... (answered by HyperBrain)
A concrete mix is in volume proportions of 1 part cement, 2 parts water, 2 parts... (answered by edjones)
A contractor mixed two batches of concrete that were 9.3 and 11.3 percent cement to... (answered by Earlsdon)
please help me on this problem! A contractor has been assigned the job of painting the... (answered by solver91311)