SOLUTION: A concrete driveway measures 14 yards by 5 yards. The driveway will be 0.75 yards thick. A) How many cubic yards of concrete will be needed? B) How much will it cost if concrete is
Algebra.Com
Question 170648: A concrete driveway measures 14 yards by 5 yards. The driveway will be 0.75 yards thick. A) How many cubic yards of concrete will be needed? B) How much will it cost if concrete is $4.75 per cubic yard?
Answer by Mathtut(3670) (Show Source): You can put this solution on YOUR website!
cu yards will be needed
:
dollars
RELATED QUESTIONS
5. A concrete driveway measures 14 yards by 5 yards. The driveway will be 0.75 yards... (answered by Earlsdon)
5. A concrete driveway measures 14 yards by 5 yards. The driveway will be 0.75 yards... (answered by checkley77)
A concrete driveway measures 14 yards by 5 yards. The driveway will be 0.75 yards thick.... (answered by nerdybill)
A concrete driveway measures 14 yards by 5 yards. The driveway will be 0.75 yards thick.... (answered by orca)
A concrete driveway measures 14 yards by 5 yards. The driveway will be 0.5 yards thick. (answered by unlockmath)
A concrete driveway measures 18 yards by 4 yards. The driveway will be 0.5 yards thick.... (answered by checkley71)
A concrete driveway measures 18 yards by 4 yards. The driveway will be 0.5 yards thick.... (answered by checkley71)
A concrete driveway measures 18 yards by 4 yards. the driveway will be 0.5 yards thick.... (answered by solver91311)
A concrete driveway measures 18 yards by 4 yards. The driveway will be 0.5 yards thick.... (answered by jojo14344)