Question 1196559: A textile company has specific dyeing and drying times for its different cloths. A roll of
Cloth A requires 55 minutes of dyeing time and 45 minutes of drying time. A roll of Cloth
B requires 60 minutes of dyeing time and 30 minutes of drying time. The production
division allocates 2280 minutes of dyeing time and 1560 minutes of drying time for the
week. How many rolls of each cloth can be dyed and dried?

Answer by ikleyn(52796)   (Show Source): You can put this solution on YOUR website!
.
A textile company has specific dyeing and drying times for its different cloths.
A roll of Cloth A requires 55 minutes of dyeing time and 45 minutes of drying time.
A roll of Cloth B requires 60 minutes of dyeing time and 30 minutes of drying time.
The production division allocates 2280 minutes of dyeing time and 1560 minutes
of drying time for the week. How many rolls of each cloth can be dyed and dried?
~~~~~~~~~~~~~~~~~

a = # of rolls Cloth A;

b = # of rolls Cloth B.


Write equations as you read the problem

    55a + 60b = 2280   (1)   (minutes of dyeing time)

    45a + 30b = 1560   (2)   (minutes of drying time)


To solve, apply the elimination method.  For it, multiply equation (2) by 2 (both sides).
Keep equation (1) as is

    55a + 60b = 2280   (1)

    90a + 60b = 3120   (2')


From equation (2') subtract equation (1)

    35a       = 3120 - 2280 = 840

      a                     = 840/35 = 24.


ANSWER.  a = 24 rolls Cloth A  and  b =  = 16 rolls Cloth B.

Solved.



RELATED QUESTIONS

I am having a terrible time trying to figure out! Please Help!! a textile company has (answered by ewatrrr,htmentor)
Just show how you got the answer. #6. A textile company has specific dyeing and... (answered by stanbon)
well for class we have to read a word problem and define variables i dont know how to do... (answered by josmiceli)
A paint manufacturing company claims that the mean drying time for its paint is not more... (answered by ewatrrr)
8) A small company makes masks and gloves. Resources required are cloth and labour. The... (answered by ikleyn)
A firm can produce three types of cloths A, B and C. Three kinds of wool are required... (answered by ikleyn)
You make decorative stones for landscaping. A ton of coarse stones requires 2 hours of... (answered by Theo)
Using the poisson distribution cloth is woven continously in a textile mill and from... (answered by Boreal)
Sally has a piece of cloth. She used 1 3 of the cloth to make a pillow cover and... (answered by Alan3354)