Question 983084: A building contractor is to dig a foundation 40 feet long, 30 feet wide, and 14 feet deep. The contractor pays $12 per load for trucks to remove the dirt. Each truckload holds 8 cubic yards. What is the cost to the contractor to have all the dirt hauled away?
Answer by macston(5194) (Show Source): You can put this solution on YOUR website!
.
The contractor must remove 16800ft^3 of dirt.
.
The dump trucks remove 216ft^3 per load
.
.
77.78 loads x $12/load = $933.33
ANSWER: It cost the contractor $933.33 to have the dirt removed.
RELATED QUESTIONS
A building contractor is to dig a foundation 42 feet long, 24 feet wide, and 9 feet deep. (answered by Fombitz)
A building contractor is to dig a foundation 45 feet long, 25 feet wide, and 9 feet deep. (answered by mananth)
A building contractor is to dig a foundation 45 feet long, 25 feet wide, and 6 feet deep. (answered by josmiceli)
A building contractor is to dig a foundation 54 feet long, 25 feet wide, and 6 feet deep. (answered by rfer)
A general contractor is constructing a building that requires a concrete foundation that (answered by edjones)
A general contractor is constructing a building that requires a concrete foundation that... (answered by Boreal)
A general contractor is constructing a building that requires a concrete foundation that... (answered by rfer)
20 men can dig a tank 40 feet long and 30 feet broad and 10 feet deep in 25 days. In how... (answered by Solver92311,ikleyn)
A contractor is building a concrete sidewalk 10 ft. wide by 50 ft. long and 4 inches... (answered by ankor@dixie-net.com)