SOLUTION: Mark lays a slab of concrete in 6 hours. tony lays the same size slab in 2 hours. if both work on the job together and the cost of labor is $42 per hour, decide what the labor esti

Algebra.Com
Question 970929: Mark lays a slab of concrete in 6 hours. tony lays the same size slab in 2 hours. if both work on the job together and the cost of labor is $42 per hour, decide what the labor estimate should be
Answer by josgarithmetic(39630)   (Show Source): You can put this solution on YOUR website!
(1/6+1/2)(JOBS/HOUR)(1/43)(HOUR/DOLLARS)=howmany(JOBS/DOLLARS)









, to do the one job.

RELATED QUESTIONS

Marcus and Tony work for​ Lombardo's Pipe and Concrete. Mr. Lombardo is preparing... (answered by mananth,josgarithmetic,ikleyn)
Marcus and Tony work for Lombardo's Pipe and Concrete. Mr. Lombardo is preparing an... (answered by josgarithmetic)
Marcus and Tony work for Lombardo's Pipe and Concrete. Mr.Lombardo is preparing a quote... (answered by richwmiller)
Marcus and Tony work for the same company. Marcus lays a slap of concrete in 5 hours.... (answered by ReadingBoosters)
Marcus and Tony work for the same company. Marcus lays a slab of concrete in 5 hours.... (answered by fractalier)
Hello There, I'm stuck on this problem on my online algebra homework and can never see... (answered by richwmiller)
A house is to be built on a rectangular concrete slab measuring 54 feet by 23 feet. If... (answered by scott8148)
Allen is building a tennis court in his backyard. He poured a rectangle concrete slab and (answered by rfer)
Solve the problem Mark and Rachel both work for Smith Landscaping Company. Mark can... (answered by mukhopadhyay)