SOLUTION: Which equation can be used to find the answer? A contractor needs 36 bags of cement to do a job. She already has 17 bags. How many more bags does she need to do the job?

Algebra.Com
Question 915041: Which equation can be used to find the answer?
A contractor needs 36 bags of cement to do a job. She already has 17 bags. How many more bags does she need to do the job?

Answer by ewatrrr(24785)   (Show Source): You can put this solution on YOUR website!
 
Hi
36
-17
19, How many more bags does she needs
RELATED QUESTIONS

I am not sure if I am posting this in the right place A contractor mixes concrete... (answered by Boreal,jim_thompson5910)
how many bags of 7% cement should be mixed with 4 bags of 17% to produce a mix... (answered by checkley79)
a contractor mixes concrete from bags of pre-mix for small jobs. How many bags with 8%... (answered by edjones)
A contractor mixes concrete from bags of pre-mix. How many bags with 10% cement should... (answered by ptaylor)
A contractor mexes concrete from bags of pre-max for small jobs. How many bags with 10%... (answered by checkley75)
A contractor mixes concrete from bags of pre-mix for small jobs. How many bags with 4%... (answered by checkley71)
a contractor mixes concrete from bags of pre-mix for small jobs. How many bags with 11%... (answered by checkley77,nerdybill)
A contractor mixes concrete from bags of pre-mix for small jobs. How many bags with 6%... (answered by nerdybill)
a contractor mixes concrete from bags of pre-mix for small jobs. how many bags with 6%... (answered by stanbon,richwmiller)