Question 779089: Smith engineering is in the process of reviewing the salaries of their surveyors. During the review, the company found that an experienced surveyor can survey a roadbed in 6 hours. An apprentice surveyor needs 8 hours. If the two work together, find how long it takes them to complete the job.
Answer by josmiceli(19441)   (Show Source): You can put this solution on YOUR website!
experienced surveyor's rate:
( 1 roadbed surveyed ) / ( 6 hrs )
---------------------------
apprentice surveyor's rate:
( 1 roadbed surveyed ) / ( 8 hrs )
---------------------------
Let = their time in hrs to survey
the roadbed working together
Add the rates to get their rate working together

Multiply both sides by




It takes them 3 hrs and 26 min
check:



close enough

RELATED QUESTIONS

Smith Engineering is in the process of reviewing the salaries of their surveyors. During... (answered by josmiceli)
smith engineering is in the process of reviewing the salaries of their surveyors. during... (answered by DrBeeee)
Smith engineering is in the process of reviewing the salaris of their surveyors. During... (answered by stanbon)
The salaries of a secretary, a salesperson, and a vice president for a retail sales... (answered by josgarithmetic)
The national average salary for a computer consultant is $53,336. For a large computer... (answered by robertb)
A car company found that ,on average, 2 in 100 of their car engines malfunction during... (answered by Boreal)
The salaries of A, B, C are in the ratio 2:3:5. if the increment of 15%, 10% and 20% are... (answered by ankor@dixie-net.com)
the salaries of a,b,c are in the ratio 1:2:5 respectively.if the increments of 20%,... (answered by ankor@dixie-net.com)
The monthly salaries of... (answered by ikleyn)