SOLUTION: A can do a certain job in 40days which b alone can do it in 30 days .A started the work and was joined by after 19 days .In how many days was the work completed?

Algebra.Com
Question 609393: A can do a certain job in 40days which b alone can do it in 30 days .A started the work and was joined by after 19 days .In how many days was the work completed?
Answer by flame8855(424)   (Show Source): You can put this solution on YOUR website!
rate (A)= 1/40
Rate (B)= 1/30
if together = 1/40+1/30 = 7/120=7/120
for 19 days
19/40 will be done and only 21/40 will be left
7x/120=21/40
x= 9
total days = 19+9=28 days

RELATED QUESTIONS

Sam can do a certain job in six days. After working alone for three days, he is joined by (answered by lwsshak3)
A can complete a job in 9 days, B can do the same job in 10 days and C can do it in 15... (answered by richwmiller)
Kindly answer this word problem: Alex can do a piece of work in 20 days; Allen can do it (answered by nerdybill)
A and B can do a work in 12 days,B and C in 16 days. A started work and afte 7 days he... (answered by josgarithmetic)
A,B and C can do a piece of work together in 15 days. B alone can do in 30 days and C... (answered by ankor@dixie-net.com)
A and B can do a job in 12 days and B and C can do it in 16 days. A and B started... (answered by josgarithmetic)
A can do a piece of work in 4 1/2 days. After he has worked three days, B joined him and... (answered by richwmiller)
1.'A' works twice as fast as 'B'. If both of them together take 6 days to complete the... (answered by josmiceli,vvnrichards)
Raja can do a piece of work in 20 days , while Ramesh can finish it in 25 days. ramesh... (answered by josgarithmetic,stanbon)