SOLUTION: During a 4th of July weekend, 32 vehicles became trapped on the Sunshine Skyway Bridge while it was being repaved. A recent city ordinance decreed that only cars with 4 wheels and
Algebra.Com
Question 394960: During a 4th of July weekend, 32 vehicles became trapped on the Sunshine Skyway Bridge while it was being repaved. A recent city ordinance decreed that only cars with 4 wheels and trucks with six wheels could be on the bridge at any given time. If there were 148 tires that needed to be replaced to due to damage, how many cars and trucks were involved in the incident?
can you show your work? thanks for your time.
Answer by MathLover1(20850) (Show Source): You can put this solution on YOUR website!
let and
since there were , we have
cars have so , trucks have so
the of wheels is , so
set up an equation system and solve it:
multiply the top equation by to get rid of and solve for :
---------------------------
so trucks and cars were involved
check:
RELATED QUESTIONS
4. During a 4th of July weekend, 32 vehicles became trapped on the Sunshine Skyway Bridge (answered by solver91311)
4.During a 4th of July weekend, 32 vehicles became trapped on the Sunshine Skyway Bridge... (answered by Edwin McCravy)
During a 4th of July weekend, 32 vehicles became trapped on the Sunshine Skyway Bridge... (answered by lynnlo,Alan3354)
During a 4th of July weekend, 32 vehicles became trapped on the Sunshine Sky... (answered by drcole)
At Trinity Hospital, 65 girls and 70 boys were born during July. Based on this data, find (answered by Boreal)
Two bridges on the Blake River are 10 km apart. You can see along the river from one... (answered by ikleyn)
A bridge is to be built across a waterway which is
50 feet wide and is frequented by... (answered by ankor@dixie-net.com)
Can I get help in solving this problem?
a. For classes of 222 students, find the mean... (answered by Boreal)
A BRIDGE IS DESIGNED TO CARRY A MAXIMUM LOAD OF 150,000 POUNDS. IS THE BRIDGE OVERLOADED... (answered by Fombitz)