SOLUTION: A machine weaves 2 2/3 meters of fabric in the first hour of operation. All the rest of the time the machine runs, it weaves 3 2/3 meters per hour. If the machine is turned on

Algebra.Com
Question 326360: A machine weaves 2 2/3 meters of fabric in the first hour of operation. All the rest of the time the machine runs, it weaves 3 2/3 meters per hour. If the machine is turned on and allowed to run for 25 hours, how many meters of fabric will it weave?
Answer by stanbon(75887)   (Show Source): You can put this solution on YOUR website!
A machine weaves 2 2/3 meters of fabric in the first hour of operation. All the rest of the time the machine runs, it weaves 3 2/3 meters per hour. If the machine is turned on and allowed to run for 25 hours, how many meters of fabric will it weave?
------------------------
2 2/3 + 24(3 2/3)
= (8/3) + 24(11/3) = 90 2/3 meters
=====================================
Cheers,
Stan H.
==============

RELATED QUESTIONS

Two machines turn out all the products in a factory, with the first machine producing 57% (answered by math_tutor2020,ikleyn)
machine A can do a piece of work in 6 hours , machine B can do the same work in 9 hours.... (answered by ikleyn)
Three machines turn out all the products in a factory, with the first machine producing... (answered by ikleyn)
2.In a factory, three machines, J, K and L, are used to make biscuits. Machine J makes... (answered by ikleyn)
An old machine produces 30 components per hour and a new machine produces 40 components... (answered by ikleyn)
A clerk can add 40 columns of figures an hour by using an adding machine and 20 columns... (answered by ankor@dixie-net.com)
A machine can produce 12 clay figures per hour. It costs $750 to setup the machine and $6 (answered by benni1013)
An office has two envelope-filling machines. Working together, they can fill a batch of... (answered by josgarithmetic)
Tempco Corporation has a machine that produces 12½ baseball gloves each hour. In the last (answered by josmiceli)