SOLUTION: A road crew can pave 1.5 miles of road in an eight hour shift. If they were stopped after two hours because of weather conditions, how many feet of road did they pave? (5280 feet =
Algebra.Com
Question 184577: A road crew can pave 1.5 miles of road in an eight hour shift. If they were stopped after two hours because of weather conditions, how many feet of road did they pave? (5280 feet = 1 mile)
Answer by jojo14344(1513) (Show Source): You can put this solution on YOUR website!
Let's convert 1st:
So they can paved 7920ft in 8 hours:
So in 2 hours:--->
.
Or simply by Ratio & Proportion:
---->
in 2 hours
Thank you,
Jojo
RELATED QUESTIONS
Each of two road graders can pave a certain section of the road in 15 hours working... (answered by stanbon)
One road crew can pave a section of highway in 15 h. A second crew can do the same job in (answered by josgarithmetic,ikleyn,Alan3354,greenestamps)
Each of two road graders can smooth a section of road in 10 hours working alone. After... (answered by mananth)
If a surfacing crew can pave five feet of asphalt per minute, how many hours will it take (answered by richard1234)
in checking records finds that crew A can pave a contract length of highway in 8 hours.... (answered by scott8148)
Two cars start at the same time from towns 600 miles apart and drive toward eachother.... (answered by richwmiller)
A construction crew is lengthening a road that originally measured miles. The crew is... (answered by josgarithmetic)
if a road crew painted 450 yards of lines on a new road,how many meters did they... (answered by Fombitz)
if it takes 8 1/2 hours for 6 workers to pave 140 meters of road how many hours would it... (answered by ptaylor)