SOLUTION: Lisa can shovel snow from her driveway in 65 minutes. Jim can to the same job in 55 minutes. How long would it take lisa and jim to shovel the driveway if they worked together?
Algebra.Com
Question 1190520: Lisa can shovel snow from her driveway in 65 minutes. Jim can to the same job in 55 minutes. How long would it take lisa and jim to shovel the driveway if they worked together?
Answer by Alan3354(69443) (Show Source): You can put this solution on YOUR website!
Lisa can shovel snow from her driveway in 65 minutes. Jim can to the same job in 55 minutes. How long would it take lisa and jim to shovel the driveway if they worked together?
================================
Lisa does 1/65 of the job per minute.
Jim does 1/55 of the job per minute.
Together, they do (1/65) + (1/55) per minute.
================
--> 65*55/(65 + 55) minutes
RELATED QUESTIONS
Lisa can shovel snow from her driveway in 65 minutes. Jim can do the same job in 55... (answered by checkley77)
Lisa can shovel snow from her driveway in 35 minutes. Tom can do the same job in 55... (answered by nerdybill)
lisa can shovel snow from her driveway in 60 minutes. bill can do the same in 55 minutes. (answered by Alan3354,DominoEfx,richwmiller)
#16
LISA CAN SHOVEL SNOW FROM HER DRIVEWAY IN 65 MINUTES. bILL CAN DO THE DRIVEWAY IN 45 (answered by oberobic)
Maria can shovel snow from her driveway in 50 minutes. Jim can do the same job in 65... (answered by josgarithmetic)
Maria can shovel snow from her driveway in 60 minutes. Jim can do the same job in 55... (answered by Alan3354)
Maria can shovel snow from her driveway in 60 minutes, jim can do the same job in 55... (answered by solver91311)
Sue can shovel snow from her driveway in 35 minutes. Jim can do the same job in 30... (answered by saifoo.khan)
Please help me solve this
Lisa can shovel snow in 45 minutes and Jim can shovel the... (answered by ankor@dixie-net.com)