20 men can dig a tank 40 feet long and 30 feet broad and 10 feet deep in 25 days.
In how many days will 60 men dig a tank 90 feet long, 60 feet broad and 20 feet deep?
~~~~~~~~~~~~~~~~
In first scenario, the volume of the tank is 40*30*10 = 12000 cubic feet.
and the rate of work is = 24 cubic feet per day per man.
In second scenario, the volume of the tank is 90*60*20 = 108000 cubic feet.
and the rate of work is = cubic feet per day per man, where x is an unknown number of days.
Assuming that the rate of work is the same in both scenarios, we have this equation
24 = ,
which implies x = = 75 days. ANSWER
Solved.