SOLUTION: If A and B work on a project, they need 8 1/9 days. A worked alone for 8 days then B worked alone for 10 days and finished the project. In how many days can A complete the project

Algebra.Com
Question 1163797: If A and B work on a project, they need 8 1/9 days. A worked alone for 8 days then B worked alone for 10 days and finished the project. In how many days can A complete the project alone? B?
Found 2 solutions by josgarithmetic, ikleyn:
Answer by josgarithmetic(39620)   (Show Source): You can put this solution on YOUR website!




Maybe try and :

------------Maybe try elimination method from here.

Answer by ikleyn(52803)   (Show Source): You can put this solution on YOUR website!
.
If A and B work on a project, they need 8 1/9 days. A worked alone for 8 days then B worked alone for 10 days
and finished the project. In how many days can A complete the project alone? B?
~~~~~~~~~~~~~


Let "a" be the rate of work of A, i.e. the part of work which A makes per day.

Let "b" be the rate of work of B, i.e. the part of work which B makes per day.


First statement of the problem says that the combined rate of work of A and B, working together,

is the value reciprocal to  8 = 

    a + b = .            (1)


The second statement of the problem says that

    8a + 10b = 1.           (2)



    Thus the setup is completed, and you have now two equations for two unknowns "a"  and  "b".



To solve this system of equations, multiply equation (1) by 8 (both sides).  Keep equation (2) as is.
You will get then

    8a +  8b =           (3)

    8a + 10b = 1             (4)


Next, subtract equation (3) from equation (4) (both sides).   You will get

          10b - 2b = 1 - ,   or

           2b      =  = .


Hence,  b =  = .

It means that B makes    of the job per day;  hence, B needs 146 days to complete the job alone.


Part of the problem is thus solved, and we need to find "a" now.


For it, from equation (2) you have

    8a = 1 - 10b = 1 -  = ;

hence,  a =  : 8 = .


It means that A needs   = 8   days to complete the job alone.

Solved.

The numbers in the answer are ugly  (at least one is ugly),  but I checked them against the equations  (1)  and  (2),
and the answer is  CORRECT.



RELATED QUESTIONS

A can do a piece of work in 4 1/2 days. After he has worked three days, B joined him and... (answered by richwmiller)
when a b and c work together they finish installing a garden in 3 days. The job could be... (answered by ikleyn)
When A,B and C work together, they can finish installing the garden in 3 days. The job... (answered by ikleyn)
A project is assigned to D and F. If F works on the project alone, he will take 15 more... (answered by richwmiller)
A and B can do a work in 20 and 30 days respectively. A worked for few days and with the (answered by richwmiller,ankor@dixie-net.com)
A and B can do a work in 20 and 30 days. A worked for few days and with the help of... (answered by richwmiller)
A,B,and C undertook a construction project. A and B worked together the first 6 days and... (answered by ankor@dixie-net.com)
Alan and Jim were asked by their boss to work on a project. Since Jim had to visit a... (answered by mukhopadhyay)
A and B can do a job in 12 days and B and C can do it in 16 days. A and B started... (answered by josgarithmetic)