SOLUTION: Six men working at the same rate can weed a farm in 16 days. After working for 4 days, 2 more men were hired. How long did they take to weed the farm?
Algebra.Com
Question 1156875: Six men working at the same rate can weed a farm in 16 days. After working for 4 days, 2 more men were hired. How long did they take to weed the farm?
Found 2 solutions by mananth, josgarithmetic:
Answer by mananth(16946) (Show Source): You can put this solution on YOUR website!
Six men working at the same rate can weed a farm in 16 days. After working for 4 days, 2 more men were hired. How long did they take to weed the farm?
6 men ----16 days
1 man-----x days
1 man does 1/96 of the job in 1 day
6 men will do 6/96 =1/16 of the job in 1 day
they work for 4 days so they complete 4*1/16 of the job = 1/4 of the job
Balance job = 1-(1/4) = 3/4 of the job
8 men will complete 8*1/96 of the job in 1 day= 1/12 of the job
1/12 of the job in 1 day
3/4 of the job in y days
y = (3/4)/(1/12)
y = Balance job in 9 days
9+4 =13 days
The job will be completed in 13 days instead of 16 days
check calc
Answer by josgarithmetic(39617) (Show Source): You can put this solution on YOUR website!
-------------------------------------------
Six men working at the same rate can weed a farm in 16 days.
--------------------------------------------
r, the rate for one man
For one job of "weed a farm", and 6 men doing this job, .
Or, .
----------------------------------------------------------------
After working for 4 days, 2 more men were hired. How long did they take to weed the farm?
---------------------------------------------------------------
"They" meaning all 6+2=8 men together to finish the job.
-
--------------------- nine more days after hiring the two more men
RELATED QUESTIONS
6men can weed the farm for 16days.After working for 4 days 2 more men were added. For how (answered by Theo,josgarithmetic,MathTherapy,greenestamps,ikleyn)
Twelve men can finish a job in 16 days. Five men were working at the start, after 8 days... (answered by ankor@dixie-net.com,josgarithmetic)
If 5 men dig a drain in 14 days, how long would 7 men take working at the same rate?... (answered by richwmiller)
if 9 men can do a piece of work for 20 days, how long would it take 4 men to do do,... (answered by josgarithmetic)
please help me to answer this question. eight men lake 12 days to cultivate a piece of... (answered by greenestamps,Theo,ikleyn,josgarithmetic)
25 men can do a project in 20 days . 15 men leave the project after working for some... (answered by josmiceli)
20 men can do a piece of work in 24 days. After working for few days,4 men are added and... (answered by fractalier)
Ten men can dig a trench in 4 days.How many men would dig the same trench in 2... (answered by Alan3354,ankor@dixie-net.com)
if four men do a piece of work in 8 days how many days will it take 16 men working at the (answered by ewatrrr)