SOLUTION: seven students arrange a shelf in 4 hours, at the same rate, how long would the job take 2 students?
Algebra.Com
Question 1016292: seven students arrange a shelf in 4 hours, at the same rate, how long would the job take 2 students?
Answer by ikleyn(52786) (Show Source): You can put this solution on YOUR website!
.
7*4 = 2*t,
t = = 7*2 = 14 hours.
RELATED QUESTIONS
the time required to complete an engine overhaul varies inversely as the number of people (answered by Theo,ikleyn)
suppose an average professor can do a certain job in nine hours and an average student... (answered by ankor@dixie-net.com)
Suppose an average professor can do a certain job in nine hours and an average student... (answered by ikleyn)
1. (a) If 5/8 of a room can be painted in 1 hour, what is the rate of work of the room... (answered by richwmiller)
John can do a job in 4 hours and Mark can do the same job in 2 hours. If they work... (answered by Cromlix)
alice can do a job in 4 hours, christina can do the same job in 5 hours. how long would... (answered by ikleyn)
If A does a job in 16 hours and B does the same job in 12 hours, if B and C do the job... (answered by josmiceli,richwmiller)
Bob can do a job in 1 hour, John can do the same job in 2 hours, Lisa can do the same job (answered by kev82)
10 men can complete a job in 14 days. How long will it take 4 men to finish the same job... (answered by josgarithmetic)