Question 935930: A contractor uses the expression 7(x+3) to find the length in feet of chains that he needs for a certain project. The contractor needs four chains that are this length. What is the total length of all of the chains?
Answer by TimothyLamb(4379) (Show Source): You can put this solution on YOUR website!
4*7(x + 3)
28x + 3*28
28x + 84
---
Free algebra tutoring live chat:
https://sooeet.com/chat.php?gn=algebra
---
Solve and graph linear equations:
https://sooeet.com/math/linear-equation-solver.php
---
Solve quadratic equations with quadratic formula:
https://sooeet.com/math/quadratic-formula-solver.php
---
Solve systems of linear equations up to 6-equations 6-variables:
https://sooeet.com/math/system-of-linear-equations-solver.php
---
RELATED QUESTIONS
A contractor uses the expression 7(x-3) to find the length, in feet, of chain that he... (answered by lynnlo)
a contractor uses the expression 7(x+3) to find the length in feet of chain that he needs (answered by macston)
A contractor uses 42 workers on a job. For every 2 electricians he needs 5 carpenters.... (answered by checkley71)
A contractor is building a circular swimming pool. The radius of the circle 12 feet. He... (answered by Cromlix)
A project must be finished in 80 days. Contractor A costs $ 150 a day; Contractor B costs (answered by ewatrrr)
A general contractor has submitted two bids for two projects; A and B. The probability of (answered by ewatrrr)
the wall of a circular fountain has to be decorate by linking lengths of chains around... (answered by Theo)
A machine produces chains that are 500 links in length. The chains are made of black and (answered by venugopalramana)
A contractor estimates that he can paint a house in 5 days by using 6 men. if he actully... (answered by ankor@dixie-net.com)