SOLUTION: a new sidewalk will be 4ft long, 120ft wide, and 3inches in depth. how many cubic yards of concrete needed
Algebra.Com
Question 405506: a new sidewalk will be 4ft long, 120ft wide, and 3inches in depth. how many cubic yards of concrete needed
Answer by Alan3354(69443) (Show Source): You can put this solution on YOUR website!
4ft * 120 ft * 0.25 ft = 120 cubic feet
=~ 4.44 cu yds
RELATED QUESTIONS
A new sidewalk will be 6feet wide 240 feet long and filled to a depth of 6 inches with... (answered by Boreal)
A new sidewalk will be 4 feet wide, 140 feet long, and filled to a depth of (answered by Fombitz,ikleyn)
A new sidewalk will be 66 feet wide, 160160 feet long, and filled to a... (answered by ikleyn)
You need to order cement to make a concrete sidewalk 3 feet wide and 80 feet long.... (answered by ankor@dixie-net.com)
A contractor is building a concrete sidewalk 10 ft. wide by 50 ft. long and 4 inches... (answered by ankor@dixie-net.com)
I need help with a problem.
How many cubic yards of concrete are needed to fill a hole... (answered by user_dude2008)
Melissa wants to have a concrete driveway in the front of her house. The driveway will... (answered by Mathtut,josmiceli)
Roger is ordering concrete to lay a foundation for a new garage. The foundation will be... (answered by ankor@dixie-net.com)
Melissa wants to have concrete driveway in front of her house. The driveway will measure (answered by checkley71)