SOLUTION: a construction crew
Algebra.Com
Question 1177339: a construction crew
Answer by ikleyn(52785) (Show Source): You can put this solution on YOUR website!
.
The collection of words in this post was nonsensical, so I deleted it.
AVOID posting nonsense to this forum.
RELATED QUESTIONS
A construction crew of 150 men has enough food for 9 days. How many days will the food... (answered by ankor@dixie-net.com)
A construction crew built 1/4 miles of road in 1/8 days what is the unit rate in miles... (answered by Alan3354)
A construction crew is lengthening a road that originally measured miles. The crew is... (answered by josgarithmetic)
A construction crew is lengthening a road that originally measured 52 miles. The crew is... (answered by ikleyn)
A construction crew is building a straight ramp that rests on two beams. One beam is 3.5... (answered by Alan3354)
A construction crew has just finished building a road. The crew worked for
5 5/6 days.... (answered by ikleyn)
A construction crew is lengthening a road. Let
L
be the total length of the road (in... (answered by Alan3354)
A crew of 6 men can complete the construction of an office in 60 days. In order to speed... (answered by Abbey)
A construction crew foreman is buying k two-by-four boards for farming a house. She is... (answered by Theo)