SOLUTION: A farmer employs 12 men to pick apples. It takes them three days. How long will it take 8 men?

Algebra.Com
Question 831829: A farmer employs 12 men to pick apples. It takes them three days. How long will it take 8 men?

Answer by TimothyLamb(4379)   (Show Source): You can put this solution on YOUR website!
---
rate:
r = 1/12*3 job/man*day
---
assuming the same rate, how long will it take 8 men:
---
1/12*3 = 1/8d
8d = 12*3
d = 12*3/8
---
answer:
d = 4.5 days
---
Solve and graph linear equations:
https://sooeet.com/math/linear-equation-solver.php
---
Solve quadratic equations, quadratic formula:
https://sooeet.com/math/quadratic-formula-solver.php
---
Solve systems of linear equations up to 6-equations 6-variables:
https://sooeet.com/math/system-of-linear-equations-solver.php

RELATED QUESTIONS

If it takes 6 men 12 days to build a wall, how long will it take 12... (answered by fcabanski)
if 8 men can do a job in 12 days how long will 24 men take to complete it (answered by amarjeeth123)
if it takes 4 men 12 days to dig a hole, how long would it take 6... (answered by ptaylor)
If it takes 3 men 4 days to build a wall how long will it take 2... (answered by stanbon)
it took 15 men 12 days to pick up two tons of oranges. how long will it take nine men if... (answered by josgarithmetic)
It takes 6 men 4 days to mow a park. How long will it take 8 men to mow the park? (answered by CharlesG2)
if it takes 8 men 9 days to dig a tunnel how long will it take 6 men to dig the same... (answered by ikleyn)
It will take 12 men to build a wall in 30 days. How long should 8 men take to build a... (answered by Boreal)
three men paint a house in 5 days. How long will it take 2 men to paint the... (answered by ewatrrr)