SOLUTION: At General Electric, shift 1 produced 4 times as much as shift 2. General Electric's total production for July was 5,500 jet engines. What was the output for each shift?
Algebra.Com
Question 1015422: At General Electric, shift 1 produced 4 times as much as shift 2. General Electric's total production for July was 5,500 jet engines. What was the output for each shift?
Answer by ikleyn(52802) (Show Source): You can put this solution on YOUR website!
.
1-st shift: 4400 engines,
2-nd shift: 1100 engines.
RELATED QUESTIONS
At General Electric, shift 1 produced 4 times as much as shift 2. General Electric’s... (answered by checkley77)
At GE shift 1 produced 4 times as much as shift 2. GE's total production for July was... (answered by bucky)
At GE, shift one produced 4 times as much as shift two. GE's total production for July... (answered by edjones)
Honda day shift produced 4 times as much as shift 2. The total production for the month... (answered by Sarpi)
At Maplewood Marine, shift 1 produced 3 times as much as shift 2. Maplewood's total... (answered by ichudov)
In Ryan Corporation, the first shift produced 5 1/2 times as many lightbulbs as the... (answered by rfer,richwmiller)
In Ajax Corporation, the first shift produced 4 1/2 times as many lightbulbs as the... (answered by stanbon)
Im having trouble determing if these are parametric or nonparametric
1. Once a month,... (answered by stanbon)
The following aged accounts receivable schedule was prepared for Dulax paints at the end... (answered by solver91311)