SOLUTION: in checking records finds that crew A can pave a contract length of highway in 8 hours. Crew B can do the same job in 10 hours. how long would it take if they worked together?
Algebra.Com
Question 618539: in checking records finds that crew A can pave a contract length of highway in 8 hours. Crew B can do the same job in 10 hours. how long would it take if they worked together?
Answer by scott8148(6628) (Show Source): You can put this solution on YOUR website!
(x / 8) + (x / 10) = 1
RELATED QUESTIONS
One road crew can pave a section of highway in 15 h. A second crew can do the same job in (answered by josgarithmetic,ikleyn,Alan3354,greenestamps)
A contractor finds that Crew A takes 5(1/2) hours to construct a retaining wall and Crew (answered by ankor@dixie-net.com)
solve. by checking work records a plumber finds that worker A can do a certain job in 12... (answered by solver91311)
A 3-men crew can do a certain job in 3 weeks and 2 days, if we are to hire 4 men crew... (answered by josmiceli)
A contractor finds that Crew A takes
5(1/2) hours to construct a retaining wall and... (answered by ankor@dixie-net.com)
By checking work records, a carpenter finds that Jane can build a small shed in 12 hours. (answered by stanbon)
One roofing crew can finish a 2,800-square-foot roof in 12 hours, and another crew can do (answered by josgarithmetic)
8 person work crew completes a job in 18 hours. What is the fewest number of workers... (answered by ankor@dixie-net.com)
A roofing crew can roof a house in 10 hours. If a second crew was added, the job would... (answered by CharlesG2)