SOLUTION: If 2 men take 8 days to mow a field and the faster man can do it alone in 12 days how long will it take the slower man to do it alone?
Algebra.Com
Question 452151: If 2 men take 8 days to mow a field and the faster man can do it alone in 12 days how long will it take the slower man to do it alone?
Answer by ankor@dixie-net.com(22740) (Show Source): You can put this solution on YOUR website!
If 2 men take 8 days to mow a field and the faster man can do it alone in 12 days how long will it take the slower man to do it alone?
:
Let x = slow man's time alone
Let the completed job = 1 (a mowed field)
:
A typical shared work equation
:
+ = 1
multiply by 12x, results:
8x + 8(12) = 12x
96 = 12x - 8x
96 = 4x
x =
x = 24 days alone
:
:
check
8/12 + 8/24 =
2/3 + 1/3 = 1
RELATED QUESTIONS
one man & 2 boys can do a piece of workin 12 days, which can also done by 3 men & 1 boy... (answered by stanbon)
A man and a woman working together can sow a field in 20/9 days. The man alone can do it... (answered by stanbon)
One man and 2 boys can do a piece of work in 12 days, which can also be done by 3 men and (answered by 303795)
A man and a boy can do in 15 days of work in which would be done by 7 men and 9 boys in 2 (answered by ankor@dixie-net.com)
Working together, two men can do a job in 20 days. Working alone, however, it would take... (answered by ankor@dixie-net.com)
One crew can detassel a field of corn in 6 days. Another crew can do the same job in 4... (answered by ankor@dixie-net.com)
2 men and 5 boys can do a piece of work in 4 days, while 4 men and 4 boys can do it in 3... (answered by josgarithmetic,MathTherapy,ikleyn)
2 men and 5 boys can do a piece of work in 4 days, while 4 men and 4 boys can do it in 3... (answered by josgarithmetic,ikleyn,MathTherapy)
if 8 men can do a job in 12 days how long will 24 men take to complete it
(answered by amarjeeth123)