SOLUTION: it took 27 min to lay 32 square feet of floor. At this rate how long will it take to lay 144 square feet of flooring

Algebra.Com
Question 969607: it took 27 min to lay 32 square feet of floor. At this rate how long will it take to lay 144 square feet of flooring
Answer by macston(5194)   (Show Source): You can put this solution on YOUR website!
.
T=amount of time to lay 144 sq ft
.
Multiply each side by 27 minutes.


ANSWER: At the same rate, it would take 121.5 minutes to lay 144 square feet of flooring.

RELATED QUESTIONS

It takes j 6 hours to lay 100 square feet of tile. It takes k 5 hours to lay 100 square... (answered by ikleyn,Boreal)
If you hire the Sod Guys to lay 3000 square feet of sod, it will cost $8300. If you get (answered by stanbon)
A carpet layer can put down 400 square feet of carpeting in 2.5 hours. How many hours... (answered by ikleyn,Alan3354)
A carpet layer can put down 400 square feet of carpeting in 2.5 hours. How many hours... (answered by ikleyn)
Fred is putting down tile down for a new gymnasium. He can lay 25 square feet of tile an... (answered by solver91311)
If it takes 3 man 4 days to lay 400 feet of pipe, how many men will it take to lay 2400... (answered by josmiceli)
It takes 150 square feet of wood flooring to cover a 13 by 11 foot room, counting waste. (answered by ankor@dixie-net.com)
A floor is 10 feet long and 12 feet wide. Chris wants to lay tiles that are 10 inches... (answered by Cromlix)
A can lay a lawn in 10 hours, B can lay a lawn in 8 hours. What fraction of the lawn... (answered by ewatrrr)