You can
put this solution on YOUR website!Minimise:
This is the equation of a parabola that opens upwards (Coefficient of x^2 is positive), so the minimum value of C would be at the parabola's vertex. The x-coordintate of the vertex is given by:
Your equation is already in standard form:

so here: a = .009 and b = -1.8. The minimum value of C will be found at

Simplify.
Acme should produce 100 ball per hour to minimise the cost per hour.
It might be helpful to see the graph of the cost, C (vertical axis) versus x (horizontal axis) the number of balls produced: