SOLUTION: it takes an apprentice carpenter 2h longer to install a section of floor than it does a more experienced carpenter. After the carpenters work together for 2h. the experienced carpe

Algebra.Com
Question 973623: it takes an apprentice carpenter 2h longer to install a section of floor than it does a more experienced carpenter. After the carpenters work together for 2h. the experienced carpenter leaves for another job. It then takes the apprentice carpenter 2 h longer to complete the installation. How long would it take the apprentice, working alone, in install the floor
Answer by josgarithmetic(39617)   (Show Source): You can put this solution on YOUR website!
This is arranged as a uniform rates exercise, so you would assume (maybe incorrect in actual practice) that each person works according to his own rate.

1 job is, install a floor.

Person_____________Rate, job per hour
Apprentice__________
Experienced__________
Both together______

The process of these workers is both together for 2 hours, the apprentice alone for 2 more hours; and the job is finished.

RT=J for rate, time, job quantity. The sum of the work to be done will be 1 job.

.

Your algebra or arithmetic skills should be enough that you can solve the equation for x, which is the time for the experienced carpenter to do 1 job alone. You can then find x+2.

RELATED QUESTIONS

Hello! I need help solving this...It takes Marcy’s apprentice 9 h longer to build a deck... (answered by ankor@dixie-net.com)
An experienced carpenter can panel a room 3 times faster than an apprentice can. Working... (answered by Earlsdon)
An experienced carpenter can panel a room 3 times faster than an apprentice can. Working (answered by ptaylor)
An experienced carpenter can panel a room 3 times faster than an apprentice hall can.... (answered by edjones)
A carpenter had two apprentices for a job. The carpenter worked 6 hours longer than the... (answered by josgarithmetic)
An apprentice carpenter can complete a job in 8 hours. After he has been working on the... (answered by lwsshak3)
An experienced carpenter requires 15 hours to complete a job. An apprentice requires... (answered by Alan3354)
A demolition company wants to build a brick wall to hide from public view of the area... (answered by checkley77)
A carpenter had two apprentices for a job. The carpenter worked 6 hours longer than the... (answered by mananth,MathTherapy,josgarithmetic)