SOLUTION: I am very lost on this word problem. I don't even know where to begin. Could someone explain the steps to me? A battery manufacturing plant spends C dollars per hour to produce

Algebra.Com
Question 151427: I am very lost on this word problem. I don't even know where to begin. Could someone explain the steps to me?
A battery manufacturing plant spends C dollars per hour to produce "D" size batteries. An efficiency consultant has determined that C is related to the number of batteries produced per hour, x, according to the equation C(x)=0.01x^2 - 2.6x + 245. What number of batteries per hour minimizes the cost?
76, 130, 245 or 140 batteries.
Am I supposed to plug the number of batteries into the equation for x and solve?

Answer by scott8148(6628)   (Show Source): You can put this solution on YOUR website!
yes, you can substitute (plug in) to find the minimum value

another way is the fact that the minimum (or maximum) of a parabola (quadratic) is on the axis of symmetry

the general equation for the axis of symmetry is x=-b/(2a)

in this case __ x=-(-2.6)/[2(0.01)] __ x=130

RELATED QUESTIONS

I got a problem that I don't even know where to begin at. Maybe someone can help me out... (answered by Earlsdon)
Can someone please help. I am lost on how to start this problem. Find the sum of the... (answered by Alan3354)
Hello, I am currently doing work on some exponential and logarithmic problems. I am... (answered by Theo,ikleyn)
i know this is basic math but i am lost the teacher wants us to solve for the unknown. i... (answered by Annabelle1)
DIVIDE and show all steps to your solution. Problem: t^4 +t^3+2t^2-t-3... (answered by psbhowmick)
Could you please help me with this Calculus problem? I am finding this problem hard to... (answered by math_helper,ikleyn,greenestamps)
Totally confused on this word problem: The number of people infected after t days is... (answered by stanbon)
Could someone please show me through the steps on how to go about solving this word... (answered by oscargut)