SOLUTION: Sam and Justin together can do a work in 2 days. If they had to work separately, the time taken by Justin to do the work would be more than that of Sam by 3 days. In how many days

Algebra.Com
Question 1186013: Sam and Justin together can do a work in 2 days. If they had to work separately, the time taken by Justin to do the work would be more than that of Sam by 3 days. In how many days cam Justin do the work alone? (Applying quadratic equations)
Found 2 solutions by josgarithmetic, ikleyn:
Answer by josgarithmetic(39618)   (Show Source): You can put this solution on YOUR website!
              RATE             TIME in Days      JOBS

Sam             1/x               x                1

Justin          1/(x+3)           x+3              1

Together        1/2               2                1



Solving this will lead to a quadratic equation.

Answer by ikleyn(52793)   (Show Source): You can put this solution on YOUR website!
.
Sam and Justin together can do a work in 2 days.
If they had to work separately, the time taken by Justin to do the work would be more than that of Sam by 3 days.
In how many days cam Justin do the work alone? (Applying quadratic equations)
~~~~~~~~~~~~~~~~~~~~

Sam = x days

Justin = (x+3) days.


The combined rate equation is


     +  = .


The solution can be easily guessed MENTALLY:  x = 3 days.


ANSWER.  Sam can complete this job in 3 days, working alone.

         Justin can complete this job in 3+3 = 6 days, working alone.


CHECK.   +  =  =  =  = .    ! Correct !

Solved.

Alternatively,  you can reduce equation  (1)  to the standard quadratic equation form
and solve it formally  EITHER  using the quadratic formula  OR  by factoring.


//////////////


To see other similar solved problems, look into the lesson
    - Using quadratic equations to solve word problems on joint work
in this site.



RELATED QUESTIONS

sam and justin together can do a work in 2 days. if they had to work separately, the time (answered by josgarithmetic)
sam and justin together can do a work in 2 days. if they had to work separately, the time (answered by josgarithmetic)
Bigyan can do  of a work in 9 days. He calls Amar to finish the remaining work. They work (answered by Collinwilfixyouuprealnice)
Jack and Jill together can do a piece of work in 3 days. They can finish the work if... (answered by Edwin McCravy,ikleyn)
If Sam can do a job in 4 days that Lisa can do in 6 days and Tom can do in 2 days, how... (answered by ptaylor)
If sam can do a job in 4 days that Lisa can do in 6 days, and Tom can do in 2 days, how... (answered by nerdybill)
Sam can mow a lawn in 20 minutes and Robert can mow the same lawn in 30 minutes. If they... (answered by oberobic)
marcy and justin work at the same rate, and together they can paint a house in nine days. (answered by JulietG)
A takes 10 days less than the time taken by B to finish an embroidery work. If both A and (answered by Theo,mananth)