SOLUTION: The cement to sand to gravel for bridge contruction is 3:4:6 if you need 1520 square yards to complete the job how much of each element do you need?

Algebra.Com
Question 795214: The cement to sand to gravel for bridge contruction is 3:4:6 if you need 1520 square yards to complete the job how much of each element do you need?
Answer by ankor@dixie-net.com(22740)   (Show Source): You can put this solution on YOUR website!
The cement to sand to gravel for bridge contruction is 3:4:6 if you need 1520 square yards to complete the job how much of each element do you need?
:
I think you mean cubic yards here, but anyway
Let x = the multiplier
3x + 4x + 6x = 1520
13x = 1520
x = 1520/13
x ~ 117 is the multiplier
:
You need:
3*117 = 351 cu/yds of cement
4*117 = 468 cu/yds of sand
6*117 = 702 cu/yds of gravel
;
You can check this by finding the total of these 3

RELATED QUESTIONS

The directions on a bag of cement are to mix 1 part cement, 2 parts sand, and 3 part... (answered by richwmiller,ptaylor)
A concrete mixture is made by mixing cement, sand and gravel, by volume, in the ratio... (answered by Cromlix)
The ratio of sand to cement is 6 to 5. How much cement is in 220 kg mixture? (answered by ewatrrr)
the ratio of sand to cement is 6 to 5. how much cement is in a 220 kg... (answered by Fombitz)
If cement, gravel, and sand are to be mixed in the ratio of 3:5:7 respectively, and 5... (answered by ankor@dixie-net.com)
I really need help solving this problem: Wilson's sand and gravel will deliver 12yd^3... (answered by josmiceli)
A 3:4:1 concrete mix means that for every 2 parts of sand, 3 parts of gravel, and 1 part... (answered by )
The density and strength of concrete are determined by the ratio of cement and aggregate (answered by josgarithmetic)
Sunrise Sand and Gravel charges $4.50 for each cubic yarrd of sand plus $6.00 to deliver... (answered by josmiceli)