SOLUTION: a masons can build a 12 meters long wall in 4 days. find how many masons are required to build the 27 meters long wall in 3 days?

Algebra.Com
Question 502322: a masons can build a 12 meters long wall in 4 days. find how many masons are required to build the 27 meters long wall in 3 days?
Answer by ankor@dixie-net.com(22740)   (Show Source): You can put this solution on YOUR website!
a masons can build a 12 meters long wall in 4 days.
:
The number of man-days per meter requires: = man-days per meter
:
:
find how many masons are required to build the 27 meters long wall in 3 days?
:
A 27 meter wall requires
27 * = = 9a man-days
m = no. of masons required
3m = 9a
Divide by3
m = 3a
3a masons required to accomplish this

RELATED QUESTIONS

4 masons can build a 12 metres long wall in 4 days.find how many masons are required to... (answered by ankor@dixie-net.com)
14 Masons can be build a wall 12 meters high in 12 days.How many masons will be needed to (answered by josgarithmetic)
two masons can build a wall in 3.5 hours. Calculate how long it will take 5 masons to... (answered by ptaylor)
Eight masons can build a wall in 5 hours. How long will it take 6 masons to build this... (answered by josgarithmetic)
A certain number of masons can build a wall in 14 days. If the number of masons is... (answered by ewatrrr)
32 masons can build a wall in 9 days. How many masons can complete it in 24... (answered by htmentor)
Eight masons can build a wall in 5 hours. Calculate how long it will take for 6 masons to (answered by harpazo)
if 15 masons build a brick wall in 9 days, how long will 35 masons need to do the same... (answered by josgarithmetic)
A wall of length 40feet is constructed by 10 masons in 5 days. In how many days will 6... (answered by Edwin McCravy)