SOLUTION: 4 masons can build a 12 metres long wall in 4 days.find how many masons are required to build the 27 metres long wall in 3 days?

Algebra.Com
Question 422797: 4 masons can build a 12 metres long wall in 4 days.find how many masons are required to build the 27 metres long wall in 3 days?
Answer by ankor@dixie-net.com(22740)   (Show Source): You can put this solution on YOUR website!
4 masons can build a 12 metres long wall in 4 days.
Find no. of man-days to build 1 meter
= 1 man-days/meter
:
find how many masons are required to build the 27 metres long wall in 3 days?
:
Let m = no. of mason required
3m = 27*1
3m = 27*
cancel 3 into 27
3m = 9(4)
3m = 36
m =
m = 12 masons required to build a 27 m wall in 3 days

RELATED QUESTIONS

a masons can build a 12 meters long wall in 4 days. find how many masons are required to... (answered by ankor@dixie-net.com)
two masons can build a wall in 3.5 hours. Calculate how long it will take 5 masons to... (answered by ptaylor)
Eight masons can build a wall in 5 hours. How long will it take 6 masons to build this... (answered by josgarithmetic)
14 Masons can be build a wall 12 meters high in 12 days.How many masons will be needed to (answered by josgarithmetic)
A certain number of masons can build a wall in 14 days. If the number of masons is... (answered by ewatrrr)
Eight masons can build a wall in 5 hours. Calculate how long it will take for 6 masons to (answered by harpazo)
32 masons can build a wall in 9 days. How many masons can complete it in 24... (answered by htmentor)
if 15 masons build a brick wall in 9 days, how long will 35 masons need to do the same... (answered by josgarithmetic)
12 men can build a wall in 4 days.how many days will 3 men take to build the same wall? (answered by josgarithmetic)