SOLUTION: it required 75 men 38 days to build a flood control dike. if 18 less men were employed, how longer would it have taken to build the dike? show the solution.
Algebra.Com
Question 344669: it required 75 men 38 days to build a flood control dike. if 18 less men were employed, how longer would it have taken to build the dike? show the solution.
Answer by vleith(2983) (Show Source): You can put this solution on YOUR website!
How much 'work' is there to do? mendays of work.
You are told you only have men
The amount of work is the same
It will take 50 days to do that same job with only 57 workers
RELATED QUESTIONS
it required 75 men 38 days to build a flood control dike. if 18 less men were employed,... (answered by Fombitz)
it required 75 men 38 days to build a flood control dike.if 18 less men were employed,... (answered by Fombitz)
A team of 30 men is supposed to do a work in 38 days. After 25 days, 5 more men were... (answered by josgarithmetic)
5 men can build a house in 13 days. If 2 of the men fell sick after the 4th day, how many (answered by ankor@dixie-net.com)
If it takes 4 men 20 days to build a house how long would it take 6 men to build the... (answered by stanbon)
It takes 15 men to build a house in 120 days.Working at the same rate how many men are... (answered by stanbon)
If it takes 3 men 4 days to build a wall how long will it take 2... (answered by stanbon)
If it takes 6 men 12 days to build a wall, how long will it take 12... (answered by fcabanski)
if 6 men take 18 days to complete the hauling jobs how many days would be required to... (answered by amarjeeth123)