.
15. sue can shovel snow from her driveway in 30 mins. jim can do the same job in 35 mins. how long would i ttake sue and ime to shovel teh driveway if they worked together?
~~~~~~~~~~~~~~~~~~~~~~~~
Calculations in the post by @mananth are incorrect and should be redone (polished).
I came to make the job accurately and to present it an a way as it SHOULD be done.
Sue makes of the job per minute.
Jim makes of the job per minute.
Working together, they make
+ = = = =
of the job per minute.
So, they need = 16 minutes working together.
Solved correctly and presented properly.