Question 935441: A can do a piece of work in 10 days, B can do the same in 30 days and C in 60 days. If A is assisted on alternate days by B and C, in how many days would the work get completed?
Answer by josgarithmetic(39617) (Show Source): You can put this solution on YOUR website!
B and C work an (approximately) equal number of days, and each works HALF the number of days that A works.
Let t be number of days that A worked, and the whole job to be done is 1.
The rule is RT=J for rate, time, job. The rate expression is a little more complicated, since it is composed of a sum of terms.
I might be misunderstanding the description, but:
which shows half the days A and B do the work, and the other half of the days, A and C do the work, until the whole job is done.
Another understanding may be that half the days, A works alone and on the other half of the days, both B and C help:
One or the other of those should be the correct interpretation. Solve for t (and accept the result which seems to work right, or the one that matches your answer key if it's available).
RELATED QUESTIONS
Anne, Bella and Cindy can do a piece of work in 20, 30 and 60 days respectively. a) In... (answered by ikleyn,greenestamps,MathTherapy)
A can make a wall in 10 days, B can make in 20 days and C cn make in 30 days. If A is... (answered by MathLover1)
A, B & C can do a piece of work in 30,20 & 10 days respectively. A is assisted by B on... (answered by ankor@dixie-net.com)
A,B and C can do a piece of work together in 15 days. B alone can do in 30 days and C... (answered by ankor@dixie-net.com)
A, B, and C can do a piece of work in 10 days. A and B can do it in 12 days, A and C in... (answered by josmiceli)
A,B, and C can do a piece of work in 10 days. A and B can do it in 12 days, A and C in 20 (answered by dkppathak)
A can do a piece of work in 30 days,and B can do the same work in 40 days,if both do... (answered by richwmiller)
A,B and C do a piece of work in 10 days. A and B can do it in 12 days. A and C in 20... (answered by savvyhush23)
A can do a piece of work in 2 days as B can do in 3 days. B can do as much work in 4 days (answered by ankor@dixie-net.com)