Answer by Alan3354(69443)   (Show Source): You can put this solution on YOUR website!
The worker on machine A can complete a certain job in 6 hours. The worker on machine B can do the same job in 4 hours. In a rush situation, how long would it take both machines to complete the job???
-------------------
This type of problem comes up in real life, and it's puzzling until you know how it works.
You have 2 machines, one takes 6 hours, one takes 4 hours. Obviously, working together will take less time than either of them alone, so you can't add the 4 and 6.
What's necessary is to look at how may jobs, or parts of the job, are completed per hour, not hours per job.
Machine A takes 6 hours/job, so that's 1/6 jobs/hour.
Machine B takes 4 hours/job, so that's 1/4 jobs/hour.
Now you can add those up, 1/6 + 1/4 jobs/hour working together.
= 5/12 jobs/hour.
Invert that, and you get 12/5 hours/job together, or 2.4 hours.
It looks right, it's less than 4, but more than half of 4. If both machines took 4 hours/job, it's obvious that together it would be half, or 2 hours, but machine B takes 6, so it's gonna be more than 2.
2.4 hours is it.
This is called "the reciprocal of the sum of the reciprocals", and is seen in physical phenomena.

RELATED QUESTIONS

The worker on machine A can complete a certain job in 6 hours. The worker on machine B... (answered by josmiceli)
A Ricoh copier can complete a job in 10 minutes. A xerox machine can do the same job in... (answered by ankor@dixie-net.com)
Machine A can do a job alone in 10 hours. Machine B can do the same job alone in 12... (answered by Boreal,ikleyn,math_tutor2020)
Machine A can do a certain job in 8 hours. machine B can do the same job in 10 hours.... (answered by stanbon)
A company has a machine that can complete a job in 6 hours. With the help of a newer... (answered by checkley77)
2 landscape workers can complete a certain job in a total of 20 hours. Working alone,... (answered by josgarithmetic)
Three workers have to do a certain job. The first worker can finish the job in 8 hours.... (answered by ikleyn,greenestamps)
One worker takes 20 hours to do a job. A second worker can do the same job in 15 hours.... (answered by richwmiller)
Machine A can place wrappers on a batch of canned goods in 4 fewer hours than machine B.... (answered by solver91311)