SOLUTION: The worker on machine A can complete a certain job in 6 hours. The worker on machine B can do the same job in 4 hours. In a rush situation, how long would it take both machinists t

Algebra.Com
Question 159472: The worker on machine A can complete a certain job in 6 hours. The worker on machine B can do the same job in 4 hours. In a rush situation, how long would it take both machinists to complete the job?
Answer by josmiceli(19441)   (Show Source): You can put this solution on YOUR website!
In words:
(rate on A machine) + (rate on B machine) = rate on A & B machines together
Or, what is the sme thing,
(1 job / 6 hrs) + (1 job / 4 hrs) = 1 job / x hrs

Multiply both sides by


hrs
check answer:

Multiply both sides by



OK

RELATED QUESTIONS

The worker on machine A can complete a certain job in 6 hours. The worker on machine B... (answered by Alan3354)
A Ricoh copier can complete a job in 10 minutes. A xerox machine can do the same job in... (answered by ankor@dixie-net.com)
Machine A can do a job alone in 10 hours. Machine B can do the same job alone in 12... (answered by Boreal,ikleyn,math_tutor2020)
Machine A can do a certain job in 8 hours. machine B can do the same job in 10 hours.... (answered by stanbon)
A company has a machine that can complete a job in 6 hours. With the help of a newer... (answered by checkley77)
2 landscape workers can complete a certain job in a total of 20 hours. Working alone,... (answered by josgarithmetic)
Three workers have to do a certain job. The first worker can finish the job in 8 hours.... (answered by ikleyn,greenestamps)
One worker takes 20 hours to do a job. A second worker can do the same job in 15 hours.... (answered by richwmiller)
Machine A can place wrappers on a batch of canned goods in 4 fewer hours than machine B.... (answered by solver91311)