When the faster machine works together with the slower machine, it is the same as if 4 slower machines work simultaneously. So, then we know that 4 slower machine do the job in 6 hours, working together. It means that one slower machine will complete the job in 4*6 = 24 hours. Since the faster machine works three times faster, it needs only 24/3 = 8 hours.
It's 1 job and that 1 job is making 20,000 cans
Let time newer machine takes be N
Then we get the following equation:OR
Solve any of the above and you should get a value of 8 for N, the time the new machine takes to do the ONE (1) job, alone!