SOLUTION: A small heating unit takes 56 h longer to melt a piece of iron than does a larger unit. Working together, the heating units can melt the iron in 21 h. How long would it take each h
Algebra.Com
Question 1058316: A small heating unit takes 56 h longer to melt a piece of iron than does a larger unit. Working together, the heating units can melt the iron in 21 h. How long would it take each heating unit, working alone, to melt the iron?
Answer by josmiceli(19441) (Show Source): You can put this solution on YOUR website!
Rate of heating for large unit alone:
[ 1 piece of iron melted ] / [ t hrs ]
Rate of heating for small unit alone:
[ 1 piece of iron melted ] / [ t + 56 hrs ]
Rate for both units together:
[ 1 piece of iron melted ] / [ 21 hrs ]
--------------------------------------
Add the different units rates of melting
to get rate working together:
Multiply both sides by
I'll complete square:
and
------------------
The smaller unit alone takes 84 hrs
The larger unit alone takes 28 hrs
---------------------------------
check:
OK
RELATED QUESTIONS
A small heating unit takes 40 h longer to melt a piece of iron than does a larger unit.... (answered by josmiceli,VFBundy)
A small heating unit takes 8 h longer to melt a piece of iron than it does a larger unit. (answered by richwmiller)
A small heating unit takes 8 hours longer to melt a piece of iron than does a larger... (answered by jorel1380)
A large and a small heating unit are being used to heat the water of a pool. The larger... (answered by ankor@dixie-net.com)
A large heating unit and small heating unit are being used to heat the water of a pool... (answered by ankor@dixie-net.com)
A large and a small heating unit are being used to heat the water of a pool. The large... (answered by ankor@dixie-net.com)
A British thermal unit (Btu) is the amount of heat needed to raise the temperature of 1... (answered by greenestamps)
can you help me?
1.an older computer unit requires 12min more to print a company's... (answered by moou_b)
can you help me?
1.an older computer unit requires 12min more to print a company's... (answered by scott8148)