SOLUTION: a unit of tasks can be completed by A, B, C, D and E in 2 hours. If it is done by A and B, it can be completed in 4 hours 48 minutes, by B, C and D in 4 hours, and by A, C and E in

Algebra.Com
Question 831418: a unit of tasks can be completed by A, B, C, D and E in 2 hours. If it is done by A and B, it can be completed in 4 hours 48 minutes, by B, C and D in 4 hours, and by A, C and E in 3 hours 12 minutes. How long does it take for each person to complete the unit of tasks?
Answer by AnlytcPhil(1806)   (Show Source): You can put this solution on YOUR website!
Check the problem again. A piece of information is missing.  
There are 5 unknowns, but there is only enough information 
to get 4 equations.  That's called an "underdetermined" system.
(I'm assuming you're not taking linear algebra, or are you?
I'll assume you aren't.)  We can at best get some of times, 
and we may not get any! But let's see how far we can get
without the missing piece of information.

Let The answers be:
It takes A "a" hours to complete the task alone.
It takes B "b" hours to complete the task alone.
It takes C "c" hours to complete the task alone.
It takes D "d" hours to complete the task alone.
It takes E "e" hours to complete the task alone.

Then 
A's working rate is 1 task per "a" hours or  tasks/hour
B's working rate is 1 task per "b" hours or  tasks/hour
C's working rate is 1 task per "c" hours or  tasks/hour
D's working rate is 1 task per "d" hours or  tasks/hour
E's working rate is 1 task per "e" hours or  tasks/hour
a unit of tasks can be completed by A, B, C, D and E in 2 hours.
So their combined working rate is  1 task per "2" hours or  tasks/hour

  

So

  
If it is done by A and B, it can be completed in 4 hours 48 minutes,
4 hours and 48 minutes is  =  = 

So their combined working rate is 1 task per  hours or  or  tasks/hour

  

  
by B, C and D in 4 hours,
So their combined working rate is 1 task per 4 hours or  tasks/hour.

  

  
and by A, C and E in 3 hours 12 minutes.
3 hours and 12 minutes is  =  = 

So their combined working rate is 1 task per  hours or  or  tasks/hour

 

  

So we have the system of 4 equations in 5 unknowns;  



We consider the reciprocals to be the variables and
make this 4×6 augmented matrix:



Using a TI graphing calculator I get the "rref":



The third row translates as

, so c=16 and it takes C 16 hours to complete the task

So we substitute c=16 in the system



and simplify



We'll put it in a 4×5 augmented matrix.  But I'm quite 
sure that will be a singular matrix.



And get the "rref"



See? The bottom row is all 0's.

So the only answer we can get without the missing piece of
information is that C can complete the task in 16 hours.

Edwin

RELATED QUESTIONS

Hasan can do a job twice as fast as Jawed. Sameer can do a job as fast as Hasan and Jawed (answered by stanbon)
Crane A can unload the container ship in 10 hours, and crane B can unload it in 14 hours. (answered by MathLover1)
A tank can be filled by a pipe A in 3 hours and by pipe B in 5 hours. When the tank is... (answered by ankor@dixie-net.com)
A Painting job can be completed in 12 hours by 3 professional painters. The same job can... (answered by josmiceli)
A certain piece of work can be completed by 40 worker in 40 days. if 5 works leave every... (answered by ankor@dixie-net.com)
A library crew can shelve books in eight hours. another crew can do the job in six hours. (answered by lwsshak3)
A library crew can shelve books in six hours. Another crew can do the job in four hours.... (answered by josmiceli)
Crane A can unload the dumpster in 10 hours, and Crane B CAN UNLOAD it in 14 hours. Crane (answered by ptaylor)
A pool can be filled by pipe A in 3 hours and by pipe B in 5 hours. When the pool is... (answered by ankor@dixie-net.com)