SOLUTION: A piece of work can be done by A,B and C working together in 4 days. it can also be finished if A works 2 days; B, 7 days; and C for 5 days. How long will it take each of them to

Algebra.Com
Question 346584: A piece of work can be done by A,B and C working together in 4 days. it can also be finished if A works 2 days; B, 7 days; and C for 5 days. How long will it take each of them to finish the work?
Answer by Edwin McCravy(20060)   (Show Source): You can put this solution on YOUR website!
A piece of work can be done by A,B and C working together in 4 days. it can also be finished if A works 2 days; B, 7 days; and C for 5 days. How long will it take each of them to finish the work?
Either you stated the problem wrong or else you're telling the answer
in the problem.

You ask:

How long will it take each of them to finish the work?
Then you tell us:

it can also be finished if A works 2 days; B, 7 days; and C for 5 days.
So the answer to this: 

How long will it take A to finish the work?

is of course 2 days.

The answer to this: 

How long will it take B to finish the work?

is of course 7 days.

And the answer to this: 

How long will it take C to finish the work?

is of course 5 days.

I'm sure you didn't mean to give the answer in the problem.

Please copy it correctly and resubmit it.

Edwin

RELATED QUESTIONS

A and B working together can finish the job in 10 days. if A works 4 days and B works 3... (answered by josgarithmetic,ikleyn)
A piece of work can be done by Beejay in 4 days, by Ryan in 7 days, and by Buds in 10... (answered by nerdybill)
1.'A' works twice as fast as 'B'. If both of them together take 6 days to complete the... (answered by josmiceli,vvnrichards)
7) A, B, & C can do a piece of work in 10, 9, 15 days respectively. They started the work (answered by richwmiller)
Please solve this question : two persons A and B together can do work in 10 days. the... (answered by richwmiller)
A and B together can do a piece of work in 12 days, which B and C together can do in 16... (answered by KMST)
A certain piece of work can be completed by 40 worker in 40 days. if 5 works leave every... (answered by ankor@dixie-net.com)
A does 3/10 of a work in 6 days .He then calls in B and they finish the work in 7 days... (answered by ankor@dixie-net.com)
A and B can do a job in 12 days and B and C can do it in 16 days. A and B started... (answered by josgarithmetic)