SOLUTION: A plumber contractor decides to field-test two new pumps. One is rated at 180 gal/h and the other at 250 gal/h. She tests one, then the other. Over a period of 6 h, she pumps a tot

Algebra.Com
Question 277862: A plumber contractor decides to field-test two new pumps. One is rated at 180 gal/h and the other at 250 gal/h. She tests one, then the other. Over a period of 6 h, she pumps a total of 1325 gal. Assume both pumps operated as rated. How long is each in operation.
Answer by richwmiller(17219)   (Show Source): You can put this solution on YOUR website!
o+t=6
180*o+250*t=1325
first (o) was used for 2.5 hours
the second (t) was used for 3.5 hours


RELATED QUESTIONS

The gas mileage g (measured in mi/gal) for a particular vehicle, driven at v mi/h, is... (answered by stanbon)
testers drive 8 cars 200 miles on a test track at the same speed 1.20gal 2.18 gal 3. 16 (answered by stanbon)
10)A computer program is tested by 5 independent tests. If there is an error, these tests (answered by robertb)
2. A pool company is trying out several new drains. Drain A empties a pool at a rate of 2 (answered by josmiceli)
Ms. Parker mixes a 95% sugar cinnamon-flavored solution with a 90% sugar cherry-flavored... (answered by josgarithmetic,MathTherapy)
Ms. Sanders mixes a 75% sugar cinnamon-flavored solution with a 95% sugar cherry-flavored (answered by greenestamps)
Solve each problem by writing a linear function Luke's motorcycle has a 4.5 gal gas... (answered by josgarithmetic)
You are trying to decide which of two cars to buy. The first is American-made, costs... (answered by josmiceli,Theo)
The amount of money a plumber charges when visiting a home to make a repair is shown by... (answered by MathLover1)