Question 1202202: A construction crew is lengthening a road that originally measured 52 miles. The crew is adding one mile to the road each day. The length, L(in miles), after D days of construction is given by the following function L(d)=52+b. What is the length of the road after 36 days
Answer by ikleyn(52802)   (Show Source): You can put this solution on YOUR website!
.
A construction crew is lengthening a road that originally measured 52 miles. The crew is adding one mile
to the road each day. The length, L(in miles), after D days of construction is given by the following
function L(d)=52+b. What is the length of the road after 36 days
~~~~~~~~~~~~~~~~~


            The function in your post is written incorrectly.

            A correct writing is   L(D) = 52 + D,   where  D  is the number of working days.


To get the answer, simply substitute 36 instead of D into the formula 

    L(36) = 52 + 36 = 88 miles.    ANSWER

Solved.

--------------------

This problem is extremely simple,  but is written with a lot of pathos.

When there are so much pathos,  it imposes some obligations:
at least,  the text  (including the formulas)  should be correct.



RELATED QUESTIONS

A construction crew is lengthening a road that originally measured miles. The crew is... (answered by josgarithmetic)
A construction crew is lengthening a road. Let L be the total length of the road (in... (answered by Alan3354)
A crew repairs 1/12 mile of road each day, how long will it take the crew to repair a 3/4 (answered by rfer)
A construction crew built 1/4 miles of road in 1/8 days what is the unit rate in miles... (answered by Alan3354)
A construction crew is lengthening a road. Let "L" be the total length of the road (in... (answered by josgarithmetic)
A construction crew has just finished building a road. The crew worked for 5 5/6 days.... (answered by ikleyn)
two roads crew working together repaired 1 mile of the road in four hours. working... (answered by ankor@dixie-net.com)
One road crew can pave a section of highway in 15 h. A second crew can do the same job in (answered by josgarithmetic,ikleyn,Alan3354,greenestamps)
Two road crews, working together, repaired 1 mile of road in 4 hours. Working separately, (answered by checkley71)